-
Choose your category:
-
- Exploration Solutions
- Core & Well log analysis
- Geochemical Analysis and Interpretation
- Petrophysical Interpretation
- Rock Physics, Seismic QI
- Geomechanics
- Basin Analysis and Regional Studies
- Geological interpretation and Modeling
- Prospect Inventory and Risk analysis
- Drilling & Completion
- Concept Selection, Conceptual Design
- Preliminary well design and planning
- Detailed well design and planning
- Integrated Reservoir Study
- Core & Well log analysis
- Petrophysical Interpretation
- Rock Physics, Seismic QI
- Geomechanics
- Geological interpretation and Modeling
- Static Modeling
- Basic Reservoir Engineering
- Dynamic Modeling
- Uncertainty Analysis and History Matching
- Production Forecasting
- 4D Seismic
- Increased Oil Recovery
- Fast increase oil recovery Solutions
- EOR; from concept to field implementation
- Economic Studies & Risk Evaluation
- Production Engineering
- Flow Assurance
- Artificial Lift Design
- Material Selection
- Production Chemistry
- Surface Facilities
- Flow Assurance
- Process and facility engineering
- Material Selection
- Operation Assurance
- Production Chemistry
- OTS & Dynamic Simulation
Uncertainty Analysis and History Matching
We aim to assist our clients to increase the recovery factor, by optimizing the current production and injection schemes and improving the drainage strategy. This requires a well-history matched reservoir model, representing the reservoir.
History matching
Production history matching
Seismic history matching